Personal tools

Sponsorname

Your company could advertise here

www.fla-consulting.eu

Reference:GBR GUIDANCE FOR THE NOTIFICATION OF SERIOUS BREACHES OF GCP OR THE TRIAL PROTOCOL 08-Jul-2020 D When should the notification be made

From GxPlex

Revision as of 13:50, 16 July 2026 by Gxplex admin (talk | contribs) (1 revision imported)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search



Document information
Reference GBR GUIDANCE FOR THE NOTIFICATION OF SERIOUS BREACHES OF GCP OR THE TRIAL PROTOCOL 08-Jul-2020
Validity area GBR
Scope(s) HM
Document name GUIDANCE FOR THE NOTIFICATION OF SERIOUS BREACHES OF GCP OR THE TRIAL PROTOCOL
Version / Revision 08-Jul-2020
Status Current
Document type Official guideline
Language(s) EN
Description GUIDANCE FOR THE NOTIFICATION OF SERIOUS BREACHES OF GCP OR THE TRIAL PROTOCOL
Official source Official link
Restricted access No
Submitted by Florian Adragna
Contributors


Reference Details
Module Module 4 — Unit 4.1.4
Scope HM
Document part D

When should the notification be made

Language EN
Original entry by Florian Adragna
Contributors
Tags Serious breach, Reporting timeline, CRO, Sponsor

Content

[…] When should the notification be made? • Within 7 days of the Sponsor becoming aware of the breach. If the notification function has been delegated by the Sponsor to another party, for example, a CRO, the 7-day timeline applies to the other party. • If the Sponsor retains the notification function, then it is recommended that agreements between the Sponsor and other parties involved in the trial, for example, CROs, contractors, co-development partners, investigators, should state that the other party will promptly notify the Sponsor of a serious breach (as defined in Regulation 29A) that they become aware of, in order for the Sponsor to meet their legal obligation. In this case, the clock starts when the Sponsor becomes aware of the serious breach. • If the Sponsor obtains clear and unequivocal evidence that a serious breach has occurred (as defined in Regulations 29A), the default position should be for the Sponsor to notify the MHRA first, within 7 days, and investigate and take action simultaneously or after notification. In this case, the Sponsor should not wait to obtain all of the details of the breach prior to notification. In other cases, some degree of investigation and assessment may be required by the Sponsor prior to notification, in order to confirm that a serious breach has actually occurred. • A pragmatic approach to clock start should be employed. Inspectors will review the process for notification during MHRA GCP inspections and delays in notification may be classified as non-compliance. If in doubt about whether and when to notify, contact the MHRA GCP Inspectorate.